Rheinufertunnel
Road tunnel on the Cologne Rhine bank, with the Rheingarten above it. In high water, the area above is flooded on purpose to protect the tunnel against buoyancy.
Even Lord Mayor Konrad Adenauer pursued the idea of a tunnel along the Cologne Rhine bank. The city did not realize the project until 50 years later, starting in 1979.
Source: Wikipedia
At a Glance
- Type
- Road tunnel, structurally a covered cut (Einhausung)
- Length
- 560 meters
- Location
- Altstadt-Nord, Innenstadt district, along the Rhine between the Hohenzollern Bridge and the Deutz Bridge
- Road
- Part of Bundesstraße 51
- Opened
- 5 November 1982
- Construction cost
- 120 million DM
- Above it
- the 600-meter-long Rheingarten
During construction of the Rheinufertunnel from 1979, schoolchildren collected archaeologically valuable objects from the construction rubble and partly kept them – the excavation work is described in the source as an "archaeological catastrophe".
Construction and Rheingarten
The tunnel was built using the cut-and-cover method. It lies lower than the surrounding terrain and was covered with soil after completion. Strictly speaking, it is therefore not a tunnel but a covered cut. Construction took more than three years. The Rheingarten was laid out on the area above the structure and opened on 17 August 1984. It connects the Altstadt with the Rhine promenade. Between September and November 2006, parts of the tunnel were renovated.
Archaeological Finds
The excavation work beginning in 1979 triggered an archaeological disaster. Schoolchildren collected objects of archaeological value from the construction rubble and kept some of them. During further official excavations, a head made of Lorraine limestone came to light on 21 January 1981. Parts of chip-carved belt fittings were also found later.
Flood Protection
Because of its low position close to the Rhine, the tunnel is equipped with floodgates. It lacks sufficient protection against buoyancy and is considered a vulnerable structure. To avoid structural damage, it would have to be flooded once the water level reaches 10.70 meters. To spare the effort of such flooding, the protective wall was placed behind the tunnel, roughly in line with its landward wall. During high water, the area above the tunnel is flooded to secure it against uplift. This is easily possible because there are no structures or roads worth protecting there, only the Rheingarten with the riverside promenade.
Staged Precautions and the 1995 Flood
Precautions follow the Cologne gauge: from 6.20 meters, shipping is restricted for the first time; at 8.30 meters it is halted; at 9.80 meters the tunnel is closed. On 30 January 1995, the Rhine reached 10.69 meters and flooded the ramps of the closed tunnel. They were pumped dry on 2 February 1995. One day later, the tunnel could be reopened at a water level of 8.60 meters.
Plans for an Extension
According to press reports, the “Masterplan Innenstadt Köln” of December 2008 advocated extending the tunnel to the Rheinauhafen. To this end, the Rheinuferstraße is to be lowered gradually over about 1.5 kilometers further south as far as the Ubierring. The aim is to connect the entire Südstadt more closely to the Rhine and to improve the quality of life and leisure in the neighborhoods there.
Timeline
- 1979Construction of the Rhine bank tunnel begins using cut-and-cover method
- 1981Archaeological finds during excavations: head of Lorraine limestone (21 January)
- 1982Rhine bank tunnel inaugurated on 5 November
- 1984Rheingarten above the tunnel inaugurated on 17 August
- 1995Flood: ramps flooded, tunnel reopened on 3 February
- 2006Renovation work in the tunnel (September to November)
- 2008Inner city master plan advocates extending the tunnel to Rheinauhafen (December)
Gallery
Map
Blue dots: other places nearby — tap to explore.
You might also like — related or nearby
Comments
- Loading comments…
Sources & links
Auto-generated, last verified: 2026-10-15
How this page is made
This page draws on open sources — Wikipedia, Wikidata, official websites and the city’s open data. Every statement is checked against the sources linked here, and pages are refreshed regularly.
Spotted a mistake anyway? Tell us below — we read every submission.