European Transonic Windtunnel
Test aircraft models under near-real flight conditions: Cologne wind tunnel with test temperatures from −163 °C to 40 °C and speeds of up to Mach 1.35.
Known as the ETW, the European Transonic Windtunnel stands on Ernst-Mach-Straße, right next to the German Aerospace Center (DLR). It was built by partners from France, the United Kingdom, the Netherlands and Germany.
At a Glance
- Type
- Test and simulation facility (wind tunnel)
- Location
- Köln-Grengel, Porz district
- Completed
- 1992
- Operating company
- European Transonic Windtunnel GmbH
- Test section
- rectangular, 2.4 m wide and 2 m high
- Test operations
- up to 3 test campaigns per day
The European Transonic Windtunnel in Cologne operates at temperatures as low as −163 °C and can reach Reynolds numbers of up to 85 million for half models. According to the source, only one other wind tunnel in the world has comparable capabilities: NASA's NTF at the Langley Research Center.
History and Ownership
The facility was originally built and operated by France's ONERA, the UK's Department of Trade and Industry (DTI), the Dutch NLR and the DLR. France, the United Kingdom and Germany each held 31 percent, while the Netherlands held 7 percent. ONERA left the consortium in 2012. Today, the DLR owns 45 percent of the company, BIS and QinetiQ together hold 45 percent, and the NLR holds 10 percent.
What Sets This Wind Tunnel Apart
Pressure, temperature and speed are controlled separately. This allows Mach number, Reynolds number and dynamic pressure to be set independently of one another, so the effects of compressibility, model deformation and scaling can each be examined in isolation. According to the operator, this is based on the cryogenic concept of a pressurized wind tunnel. Only NASA's National Transonic Facility (NTF) at the Langley Research Center in the USA offers comparable capabilities.
Technology and Test Operations
Measurements are taken at pressures from 1.15 to 4.5 bar. For full models, the tunnel reaches Reynolds numbers of up to 50 million, and up to 85 million for half models. The models have a wingspan of about 1.5 m; for half models, this refers to the half-span. According to the operator, a modular model cart concept makes it possible to prepare and carry out test campaigns in parallel.
Research and Use
According to the operator, aircraft manufacturers from around the world and European researchers work with the facility. One example is the AWATAR project, in which the DLR and Airbus used the ETW to study a strut-braced wing configuration with a very high aspect ratio. The operator sees the ETW as complementing the DNW-LLF and ONERA-S1MA wind tunnels, and points to its classification as a strategic European wind tunnel by the Advisory Council for Aviation Research and Innovation in Europe (ACARE). To protect customer data, all employees have signed confidentiality agreements, according to the operator.
Timeline
- 1992European Transonic Windtunnel in Cologne completed
- 2012France (ONERA) withdraws from the operator consortium
Map
Blue dots: other places nearby — tap to explore.
You might also like — related or nearby
Comments
- Loading comments…
Sources & links
- Official website
- Official website (retrieved 2026-11-06)
- Wikidata (retrieved 2026-11-06)
- Wikipedia (retrieved 2026-11-06, rev 271608823)
Auto-generated, last verified: 2026-11-06
How this page is made
This page draws on open sources — Wikipedia, Wikidata, official websites and the city’s open data. Every statement is checked against the sources linked here, and pages are refreshed regularly.
Spotted a mistake anyway? Tell us below — we read every submission.





